Everything you need to know about retrospective approval for building work
Reviewed in September 2026 for Madrid city. Before starting work or regularising work already carried out, we check the required planning authorisation and whether the proposal can comply with planning rules. A licence, a declaration of compliance and work not subject to municipal intervention are different situations; completed work is not automatically legalised.
Retrospective approval for building work is a familiar procedure in architectural practice.
Carrying out work without the required procedure is more common than it might seem. Enclosing a terrace or building a garage, for example, may require a licence or declaration of compliance, depending on the scope and applicable rules. The professional prepares the necessary documentation, and the Council grants a licence where appropriate.
In most cases, this work is carried out without deliberate wrongdoing: people are often unfamiliar with building regulations, especially as rules can vary between municipalities.
Other cases involve informally subdividing a home or building a house without municipal authorisation.
Retrospective approval for unlicensed work: when is it possible?
In Madrid, work carried out without the required authorisation can be approved retrospectively only if it is compatible with planning rules and meets the technical requirements. We first identify what was done, when and at which property; we then establish whether a licence, declaration of compliance or another procedure is required and prepare the necessary technical documentation. If the work cannot be approved, the Council may require adaptation or reinstatement. Penalties and orders to restore compliance are separate procedures; there is no universal two-month deadline for every case.
Madrid’s Ordinance 6/2022 regulates municipal planning control procedures. The Community of Madrid’s land legislation also applies to restoring planning compliance.
Why might I need to formalise the building work?
The need for retrospective approval depends on the scope of the work and the authorisations it required, not on whether it went unnoticed.
It is advisable to review the planning position of building work in situations including:
- Obtaining an activity licence for commercial premises.
- Selling or renting.
- Arranging utility supplies.
- Carrying out fitting-out or refurbishment work.
- Applying for grants for refurbishment, building accessibility and similar work.
Many of these measures are intended to prevent circumvention of the rules in cases of home subdivision.
In addition, remember that, as a citizen, you are obliged to comply with the law, including planning law.
Does the work require a licence, a declaration of compliance or no procedure?
The answer depends on the actual scope of the work, the property and its protected status. In Madrid city, straightforward interior work may fall outside both licensing and declarations of compliance if it meets the conditions of Article 6 of the ordinance. Other works follow the declaration of compliance procedure; those reserved for prior scrutiny require a licence. Calling work ‘minor’ or ‘major’ is not enough to determine the procedure.
For example, changing building services, enclosing a terrace, working on a façade, altering a structure, establishing a business activity or changing the use of commercial premises can require different procedures. A building’s protected status, common elements and sector-specific requirements also matter. We verify the procedure before preparing the appropriate design, report or drawings. Whether a technical design is required depends on the work and applicable rules; it is not assumed for every project.
What does the retrospective approval procedure involve?
At AMMPLIO, we begin by reviewing the file, drawings and actual condition of the work. We check planning, safety, accessibility, heritage and owners’ association matters where relevant. If approval is feasible, we prepare the technical documentation and process the appropriate authorisation. If the Council has issued a request, we respond within the specific deadline stated in the file; we do not promise a general resolution in less than three months.
The municipal taxes and charges are calculated using their own assessment bases. Our published prices are the practice’s professional fees; they neither include nor quote for carrying out the construction work.
Retrospective building approval: requirements according to the stage of construction
The authorities may have identified unfinished work without a licence, or a neighbour may have reported it after completion.
There are many possible situations, depending on the state of the work when approval is required or sought.
Broadly, four stages can be distinguished:
- Work already completed.
- Work carried out incorrectly or only partly completed.
- Before work starts.
- Immediately upon completion.
In each case, the professional responsible for the design must prepare different documents because the procedure will differ.
For example, the steps for a home that has been incorrectly subdivided and fails to meet habitability standards differ from those for an owners’ association carrying out unauthorised garage works.
If in doubt, consult an expert
Building without a licence, particularly where major work is involved, poses risks to your finances and the safety of users. It is therefore advisable to rely on an architect’s assessment.
If you need retrospective building approval in Madrid, contact the AMMPLIO team. We have experience handling this documentation, whatever stage your work has reached.
We work to ensure that your building work meets the current rules so that you can seek approval with the fewest necessary changes. We bring our perspective, experience and care to make the procedure as straightforward and swift as possible.
We offer a fixed quotation in advance so that you have no unpleasant surprises, explaining the technical fees and any municipal charges or taxes that may apply, without quoting for construction.