Madrid Land Act 2021: the 2020 reform and current rules

 in Regulations

Update note, September 2026. This article analyses the reform introduced by Law 1/2020; it does not list every requirement in force today. Since then, Madrid city has also introduced Ordinance 6/2022 on licences and declarations of compliance, and Law 9/2001 has been amended. To determine whether building work, subdivision or a change of use requires a licence or declaration of compliance, the consolidated legislation, municipal ordinance and property’s circumstances must be checked. At AMMPLIO, we do this before preparing the application. Reference sources: consolidated Law 9/2001 and Ordinance 6/2022.

National land legislation, Madrid’s Land Act in particular, and the associated implementing rules establish rigorous administrative procedures for planning licences.

Regulatory requirements, administrative steps, deadlines, hearings, referrals, representations and notifications leading to a decision granting permission can mean that obtaining a licence takes longer than is desirable.

Fortunately, the Community of Madrid has joined other autonomous regions in changing its rules to streamline procedures and remove administrative obstacles in order to make planning development in Madrid more flexible and encourage it. To this end, Law 1/2020 of 8 October was passed, amending Law 9/2001 of 17 July on Land in the Community of Madrid.

What did Madrid’s 2020 land reform change?

Background and the need for reform

The explanatory memorandum to the law amending the Community of Madrid Land Act explains the reasons and background for the reform. It relies principally on Directive 2006/123/EC of the European Parliament and Council of 12 December 2006 on services in the internal market. Its aim is to facilitate access to service activities through administrative simplification, restricting administrative authorisation to cases expressly provided for by law and meeting the tests of necessity, proportionality and non-discrimination.

This Directive was transposed into Spanish law through Law 17/2009 of 23 November on free access to service activities and their exercise.

In planning law, these developments were reflected in Royal Legislative Decree 7/2015 of 30 October, approving the consolidated Land and Urban Rehabilitation Act. This legislation establishes at least two regulatory principles to be observed specifically in land-use and building activities:

  • First, all building activity requires administrative consent, approval or authorisation, meaning that regional legislation may establish the administrative controls it considers appropriate, based on the required assessment of necessity and proportionality;
  • second, certain activities remain subject to planning permission, particularly ‘new building works, construction and installations’

To achieve this, the reform introduced by the legislation changes the existing legal framework for prior planning authorisation, set out in Land Act 9/2001, specifying which cases require planning permission and which require a declaration of compliance.

This reform was adopted in the economic context of the 2020 pandemic. That historical context does not replace checking the rules in force for a project undertaken today.

Activities requiring a licence under the 2020 reform

The system of planning permission , although substantially simplified, does not disappear from Spanish law. The amendment reduces the number of land-use, construction and building activities requiring a municipal licence:

  • Earthworks and excavation that do not form part of an authorised infrastructure or construction project.
  • Building works and uses of land, subsoil or airspace which require a design under building legislation.
  • Any intervention affecting an entire listed building or one protected for environmental or historic-artistic reasons, and partial interventions affecting its protected elements.
  • Land parcelling, subdivision and division.
  • Tree felling and transplantation.
  • Siting prefabricated houses and similar installations.
  • Temporary works and uses.

Activities requiring a declaration of compliance under the 2020 reform

The revised wording of Article 155 of the Community of Madrid Land Act establishes a list of activities which, in contrast to those specified in Article 152, require only a declaration of compliance:

  • New building works of limited scale and technical simplicity, on a single storey, which have neither temporary nor permanent residential or public use.
  • Extensions, alterations, renovations or refurbishment of existing buildings which do not substantially change the overall external composition, volume, envelope or structural system, and do not require a building design under national building legislation.
  • First occupation and use of new buildings and prefabricated houses, as well as buildings and installations generally.
  • Combining plots in any land classification, except as part of a duly approved land readjustment project.
  • Any activities regulated by Law 2/2012 of 12 June on stimulating commercial activity in the Community of Madrid.
  • Enclosing plots, building sites and vacant land.
  • Demolition of existing structures and buildings, provided neither the whole nor any elements or parts have environmental or historic-artistic protection under legislation or a planning instrument.
  • Installing hoardings, signs and other outdoor advertising visible from the public highway.
  • Changes of use of buildings and installations, provided they do not change the building’s principal use.
  • Use of airspace above buildings or installations.
  • Installing and siting ancillary or small prefabricated cabins.
  • Repairing underground installations and pipes on urban land.
  • Pre-construction investigations such as trial pits, boreholes or surveys.

Therefore, the system moves away from one in which everything required administrative authorisation and a licence with the resulting delays, to a range of cases in which that authorisation is no longer a prerequisite for continuing development, starting construction or refurbishment, or obtaining first-occupation permission.

A written declaration is submitted to the authority responsible for oversight, expressly confirming compliance with the conditions imposed in the relevant designs and earlier decisions.

This means that, from the moment the declaration of compliance is entered in the receiving authority’s document register, the applicant can proceed with development and building activities as described above.

Advantages and disadvantages of the 2020 reform

Advantages

The benefits of the legislation are clear:

  • Simpler administrative procedures.
  • Avoiding delays caused by authorities taking months to decide licence applications.
  • Shorter delivery times for property development projects. Removing the need for administrative authorisation allows development work to continue without interruption.
  • All of this revitalises the economy. Work does not remain on hold, reducing the risk that the wider economic situation changes while permission is awaited. Such delays sometimes meant that an economic crisis prevented developers from restarting work because their financial capacity had fallen sharply in the meantime and credit had become unavailable.
  • It attracts investment to the Community of Madrid.

Disadvantages

The main disadvantage is the possibility of starting work and then having it stopped when the authority finds that the declaration of compliance does not meet the legal requirements.

Prior notification and declarations of compliance can be a double-edged sword. Used correctly, the benefits are clear, but misuse can lead to serious blockages and losses.

However, the law establishes safeguards to minimise these situations:

  • On the one hand, interested individuals and organisations have a mechanism for submitting enquiries about the suitability and planning feasibility of a proposal.
  • On the other, the period available to councils to inspect and check the contents of the declaration of compliance is three months.

What happens if the Council finds the declaration of compliance is incorrect?

Several situations may arise, summarised below:

  • Minor or more substantial defects or breaches may be found which are not essential: they do not undermine the fundamental nature or legality of the activity. These defects can be remedied.
  • If an essential breach is identified, the applicant is first given a hearing and the work begun on the basis of the declaration is then ordered to stop, with restoration of the position before the notification. Anyone disagreeing with that decision may challenge it administratively and before the administrative courts.
  • The Council confirms compliance. This is the ideal situation, with no issues arising.

Conflict between the reform and municipal rules

Publication of the Land Act amendment created inconsistencies with municipal ordinances adapted to the previous system. The legislature addressed this by giving local authorities one year to bring their provisions into line with the Land Act amendments.

In any event, where regional and local rules conflict, the regional rule takes precedence because it ranks higher and is later in time. The Land Act amendment therefore applies from its entry into force without waiting for municipal rules to be adapted.

Madrid City Council’s approach

Madrid City Council issued Instruction 1/2020 of the Head of the Urban Development Government Department on applying Law 1/2020 of 8 October, amending the Community of Madrid Land Act, within Madrid City Council. It provides instructions for applying the Municipal Ordinance on Planning Licence Procedures in light of the reform summarised above.

Among other matters, this instruction establishes the requirements and documents for a declaration of compliance so that the Council can subsequently check it.

Documentation envisaged at the time for a building-work declaration of compliance

  1. The declaration of compliance itself, signed by a qualified professional, identifying the detailed design prepared and confirming that it complies with the established design.
  2. Appointment and engagement documents for the technical supervision of the proposed work.
  3. Receipts confirming the relevant guarantee deposits.
  4. Where legally required, the basic study must be attached, signed by a professional qualified in construction health and safety.
  5. The design for common telecommunications infrastructure signed by a qualified professional.
  6. Evidence of the application for a licence or permission for the drainage connection.

AMMPLIO’s view of the Madrid Land Act amendment

Any amendment to planning rules generally, and land legislation specifically, should be approached cautiously. Nevertheless, we believe the Madrid change will benefit building and renovation companies as well as the end client.

More efficient procedures allow construction professionals to focus on their work of designing, building and renovating. This naturally has a positive effect on the quality of the work.

The economic aspect also needs to be considered: faster procedures facilitate investment, whether domestic or foreign, in opening a business, constructing a building or renovating a home. We should remember that construction is one of the mainstays of Madrid’s economy and of Spain’s.

The downside? Tasks previously carried out by the authorities now fall to professionals, who must account for them if required. Nevertheless, at AMMPLIO Architects we believe that the change is for the better, because ultimately the end client benefits, which is what matters.

Do you need to process an application now? Our practice checks the current rules and prepares the technical work for retrospective building approval, changes of use or subdivision according to the case. Prices on our service pages are professional fees, not construction costs.