Saltar al contenido

Madrid home refurbishment grants 2022 (closed scheme)

 in Owners’ Associations

Archive of the 2022 grant call · reviewed on 25 September 2026. The application period described here ended on 30 June 2023. Figures and requirements are retained as historical information and do not represent an open grant scheme. Before starting an application today, we check the current call, its scope and the property’s conditions. AMMPLIO’s architectural fees are separate from construction costs.

This post records the Madrid home refurbishment grant call of 2022. Its amounts and conditions are preserved as historical information; they cannot be used to calculate support available today.

The Community of Madrid published in the Regional Official Gazette (BOCM) a new call for home refurbishment grants. The €58 million in funding was divided into three programmes supporting improvements to the region’s urban and rural housing stock to achieve greater energy efficiency. The deadline for that call was 30 June 2023.

The residential refurbishment grant call in the Community of Madrid in 2022 covered several programmes: building-level refurbishment, improvements to energy efficiency in individual homes, and preparation of the Existing Building Book for refurbishment and design documentation. These grants formed part of the Recovery, Transformation and Resilience Plan, financed by the European Union.

Regarding the budget, the first programme allocated €44 million specifically to improvements to residential buildings and single-family homes, covering 40% to 80% of the intervention costs, up to a maximum of €18,800 depending on the energy savings achieved. Additional support was possible for removing asbestos-containing elements, up to €1,000 per home or €12,000 per building.

The second programme allocated €8 million to improvements in homes that reduced heating and cooling energy demand or consumption of polluting primary energy.

The grant covered 40% of the intervention cost, up to €3,000. Eligible work had to cost at least €1,000 per home. It needed to achieve at least a 7% reduction in heating and cooling energy demand, reduce polluting energy consumption or replace façade components, such as windows.

Finally, the third programme provided €6 million to cover preparation of the Building Book and development of comprehensive refurbishment designs. Grant amounts depended on the number of properties in the building and could reach €3,500 per book and €30,000 per technical improvement document.

The 2022 application period is now closed

Applications could be submitted from the day after publication of the order’s summary in the Official Gazette of the Community of Madrid until 30 June 2023. Applications submitted outside that period would not be admitted for processing.

Applications could only be submitted electronically using the online form , requiring a recognised or qualified electronic signature certificate accepted by the Community of Madrid.

Awarding the grants

Applications would be selected in submission order until funding was exhausted. Award decisions would be issued individually after checking all requirements and submitted documents.

Who were these grants intended for?

Who could benefit?

Any of the following could benefit, in accordance with each programme’s provisions under ‘ultimate recipients of the grants’:

  • Owner or usufructuary (an individual or legal entity) of a detached or terraced single-family home, or a collective residential building.
  • Tenant of the home.
  • Owners’ association.
  • A group of owners.
  • A company operating, renting or holding a concession over buildings.
  • Cooperative societies.

The beneficiaries could assign receipt of the grant to a refurbishment agent or manager by signing the corresponding agreement.

In addition to the application, supporting documents were required to qualify for the subsidy.

Which documents had to accompany the application?

Obtaining the home refurbishment grant required several documents. The main one was the deed of incorporation of a legal entity or an express statement in the application that it was duly constituted.

Entities without separate legal personality, except owners’ associations, had to state expressly in the application the implementation commitments undertaken by each group member, together with the subsidy amount allocated to each.

The funding could cover various costs, including:

  • Construction costs.
  • The management involved in carrying out the intervention and associated expenses.
  • The fees of professionals involved in managing and developing the work.
  • The cost of preparing designs.
  • Necessary technical reports and certificates.
  • The costs arising from administrative procedures and other similar general expenses.

The following were not considered eligible costs : licences, charges or taxes, except VAT, which could be included if the ultimate beneficiary could not recover or offset it in full or in part.

It was also possible to request an advance of 50% of the grant under the building-level and refurbishment-design programmes, provided this had been stated in the application form.

To check whether a programme applies to your property today, consult the Community of Madrid’s official energy-refurbishment information, its calls and deadlines.

If you need a design or technical documents for a specific intervention, you can contact AMMPLIO. Our professional fees are not the construction budget.

Leave a Comment

Obtaining an IEE in Madrid, illustrated by a stack of documentsFaçade refurbishment