Saltar al contenido

How to obtain a CIVUT in Madrid: requirements and steps in 2026

 in Hospitality and Holiday Rentals, Regulations

Reviewed on 27 October 2026. To obtain a CIVUT in the Community of Madrid, a qualified professional must inspect the property in person and issue the certificate if it meets the applicable requirements. The certificate is then used in the relevant tourism procedure. Before commissioning it, check whether the proposed activity is permitted at that property: the certificate alone does not resolve its planning status.

This guide explains what to prepare, how to arrange the inspection and which documents serve different purposes. For the scope of our work and current professional fees, see AMMPLIO’s CIVUT service.

What is a CIVUT and what does it check?

The Certificado de Idoneidad para Vivienda de Uso Turístico (CIVUT) certifies the technical conditions in Article 17 quater of Decree 79/2014, introduced by Decree 27/2026, published in the official BOCM gazette. These conditions must be checked at the property. Photographs can help prepare the visit but cannot replace the inspection.

  • Heating and a supply of cold water and domestic hot water.
  • Lighting and ventilation in bedrooms, the living/dining room and kitchen; full blackout capability in bedrooms and the living/dining room.
  • Bathroom ventilation through an accepted system.
  • A fire extinguisher inside the property, no more than fifteen metres from the exit.
  • Exit signage and a visible evacuation plan for the property and building.

The review of a holiday rental property (VUT) must also consider its layout, floor areas, equipment and occupancy under Article 18. Provide an accurate plan and explain which rooms will accommodate guests before deciding the capacity advertised in the listing.

Before booking: confirm the municipality and existing status

Start with the full address. The city of Madrid has its own planning rules, including Plan RESIDE. In other municipalities, the relevant local planning rules and council procedure must be checked. The Community of Madrid’s official VUT procedure expressly distinguishes these situations.

Explain whether this is a new activity or whether a declaration of compliance (declaración responsable), licence or other application already exists. Providing those documents at the outset allows a review of what was authorised, in whose name and for which property. A tourism registration number quoted by the seller does not replace that documentary check.

How to obtain a CIVUT, step by step

1. Gather the initial information

Prepare the address, available plans, approximate floor area and a description of the intended activity. Include the accommodation’s existing documents and identify any subsequent alterations. If you do not have plans, mention this when requesting a quotation so the necessary measurements can be included in the scope.

2. Clarify the service you are commissioning

Check whether the quotation includes the inspection, preparation of plans, the certificate and submission of the declaration of compliance. Each task should be identified. Also clarify how a second visit would be handled if a deficiency needs to be corrected. The current service page explains the commercial terms; professional fees and administrative charges are separate items.

3. Arrange access for the inspection

The whole property must be available for inspection. Arrange access to the rooms, installations and evacuation route that need checking. Explain any differences between the plan and the actual layout: a divided room, relocated kitchen or altered window can affect the assessment.

4. Resolve deficiencies before certification

If a requirement is not met, establish what needs correcting and how that correction will be verified. Buying signage will not resolve every issue: some problems concern the layout, installations or whether the use is viable. Avoid accepting bookings for an opening date that still depends on these checks.

5. Keep the certificate and complete the file

Once the CIVUT can be issued, keep it and its associated plans with the accommodation’s documents. Prepare the regional declaration using the current form, supporting documents and any necessary authorisations. Retain the submission receipt and subsequent correspondence so you can track the application and respond to requests for further information.

What changed in 2019, and how should the 2020 guides be read?

Decree 29/2019, published on 12 April 2019, introduced the CIVUT into the regional regulations. Publications from 2020 therefore already described it as a document accompanying the tourism declaration. The six-month period then provided for previously registered properties to adapt ended in 2019; it must not be confused with the transitional arrangements under Decree 27/2026.

Municipal planning rules have also changed. Older references to zones or a general rule for ground and first floors cannot determine whether a VUT may open today. In the city of Madrid, the assessment uses the current General Urban Development Plan (PGOU), as amended by Plan RESIDE, together with the property’s history and authorisations. This guide brings together the current application steps without applying those historical criteria to a new case.

What if the property was already registered?

The transitional provision of Decree 27/2026 allows three years from its entry into force to adapt certain requirements for accommodation whose activity had already commenced through a declaration of compliance. If a substantial refurbishment takes place earlier, adaptation becomes compulsory at that point. This transitional arrangement does not grant planning permission or legalise an irregular activity.

Other documents to distinguish from the CIVUT

For properties in buildings governed by horizontal property rules, review the owners’ association’s statutes and resolutions. The Horizontal Property Act requires express prior approval for new tourist accommodation activities on the terms set out in Articles 7.3 and 17.12; its second additional provision also addresses pre-existing activities.

Tourism registration, municipal authorisation and guest-reporting obligations serve different purposes. The judgment published in the BOE on 8 June 2026 annulled the national provisions concerning the Single Rental Register; it did not remove regional or municipal requirements. Our guide to holiday rental procedures in Madrid helps put the different steps in order.

Request a review of your property

Contact AMMPLIO with the municipality, address and details of any existing application or authorisation. We can then clarify the required documents, scope of work and quotation before the visit.

Leave a Comment

A residential plot as shown in the municipal cadastral recordsA commercial property’s façade