Designing and building a detached house: what it involves and its stages
Designing a home means ensuring the greatest possible comfort and convenience within the space available, whether large or small, and making the best use of its materials and services while considering the cost of building the house (for example, a 120-metre house).
When we talk about design in architectural terminology, we mean putting forward an idea and making it visible on paper or in a model. However, this is not the first step in developing a detached-house project.
The stages of a detached-house project
Throughout the design process, we fulfil a series of requirements that can be understood as the steps towards building a detached house some of which are mandatory administrative procedures.
1) Preliminary assessment
At AMMPLIO we know that preliminary assessment is fundamental to developing this type of design.
This is the stage when needs are defined and an initial indication of costs is prepared, allowing the first decisions to be made.
At this point, we not only establish the first ideas but also develop the design through sketches or schematic drawings that help guide the concept.
This preliminary assessment also starts to identify the procedures that will be needed through to completion of the project.
2) Concept design
This stage provides an overall picture of the functional, formal, construction and financial characteristics of the work, although it is not yet a final result.
At this stage, at AMMPLIO we focus on communication and on developing the initial ideas for the detached house:
- Progress review meeting to establish design, functional, technical, financial, energy and environmental objectives.
- Scaled sketch drawings of the proposed home in accordance with planning rules.
- Basic visualisation of the building volumes (a 3D image).
3) Basic design
For a detached house, the basic design is the second stage of the building design project. Once the preliminary assessment and concept design are complete, we define the characteristics of your home precisely enough to apply for the municipal building permit.
At AMMPLIO we work on specific solutions that clearly define the building. This is where we usually include:
- A descriptive and supporting report on the general characteristics of the building and the specific solutions proposed.
- General scaled and dimensioned floor plans, elevations and sections of the proposal.
- A cost estimate with overall figures for each work section and trade.
- A basic health and safety study.
- A waste management study.
The basic design defines the proposal and supports the permit application; the professional endorsement and required content are checked according to the stage and commission.
Detailed design
This is a fundamental stage. It develops the basic design by specifying all the construction systems, services, materials and elements needed to build the detached house.
Among other things:
- Measured quantities of work items.
- A direct construction cost estimate.
- Quality control.
- Waste management.
This is followed by architectural site supervision, during which the measures needed to complete the project are adopted, along with the changes, adaptations and requirements necessary to finish the work.
But what does the construction process for a detached house involve?
The construction process for a detached house
At AMMPLIO, we can provide architectural site supervision within the agreed scope and coordinate technical decisions with the other parties involved.
The technical supervision team comprises the architect as director of the works and the architectural technologist as director of construction execution.
To supervise the work, we prepare a programme, oversee implementation of the design and make all the visits needed to check the foundations and structure, as well as the required tests on the materials used.
During construction, coordination between the parties involved is essential, as is issuing progress certificates confirming that the work items have been completed correctly and that the next stages can proceed.
This process also includes:
- Review of the contract.
- The setting-out record, including the commencement record, appointments, setting out of the site and authorisations.
- Supervision of construction and the structure to ensure approval in accordance with the initial design and the structural requirements and decisions made.
- Coordination of the parties involved.
- Progress certificates during construction.
- The Site Instructions and Attendance Book under Decree 462/1971.
- The final completion certificate, endorsed by the Madrid Architects’ Association, and the building information book.
At AMMPLIO we handle the administrative procedures and paperwork with particular care because they are so important to designing and building a detached house.
As you will have seen, this process requires the involvement of many professionals, especially if you want the finished result to reflect your ideas.
Now that you know what lies behind a detached-house project, you also know how we work if you need professional support.
Would you like to build a detached house? See our house design service and tell us where your plot is located. We will explain the process and our professional fees. Construction work is quoted separately by a building contractor.
How long does it take to design and build a house?
There is no single timescale. The plot, the complexity of the design, the municipal process, contractor availability and issues arising during construction all have an influence. We therefore prepare a programme for the specific project, distinguishing design, permits and construction, without promising universal completion dates.