Everything you need to know about obtaining a hotel licence
Updated on 27 October 2026. Opening a hotel or a hostal in Madrid involves coordinating planning feasibility, the technical project, municipal authorisations and the regional tourism declaration. The expression “hotel licence” commonly covers several different procedures: completing a tourism form does not, on its own, authorise an opening.
Before buying or leasing a property, check whether the proposed accommodation is legally and technically feasible there. At AMMPLIO, we carry out that initial assessment and define the scope of the hotel architecture project in Madrid.
Hotel, hostal or hostel: first decide what you intend to open
Hotels and hostales in the Community of Madrid are governed by Decree 19/2023. Hotels may have one to five stars; pensiones and hostales, one to three. The decree defines a hostal as a pensión with more than twenty guest places and at least ten rooms. The name used to market the establishment must match the proposed accommodation category.
A hostería or hostel with shared rooms and bunk beds follows separate rules, Decree 65/2013, and has its own specific declaration of responsibility. A holiday rental property is also subject to a different regime: if that is your project, consult our guide to holiday rental requirements in Madrid.
1. Check the property and the proposed accommodation use
The assessment starts with the address, cadastral reference, authorised use and the building’s previous approvals. Establish whether the accommodation would occupy the whole building or only part of it, what heritage protection applies and which entrances can be used.
In Madrid city, the assessment considers the current General Urban Development Plan (PGOU) and Plan RESIDE, published in 2025. Article 7.6.3 bis sets specific conditions for the historic centre’s APE 00.01 area. Existing use, compatibility rules and previous authorisations are decisive; the name of a central neighbourhood alone cannot establish feasibility.
The planning rules also distinguish hotels from other types of temporary accommodation when regulating industrial plots. A conclusion reached for a hotel cannot simply be applied to a hostal. Accommodation premises within residential buildings must have independent access, but having that access does not, by itself, establish feasibility.
Elsewhere in the Community of Madrid, the relevant municipality’s planning rules and procedures must be checked. Conditions in Madrid city do not automatically apply throughout the region.
2. Match the project to the category and the building
The project must coordinate guest rooms, shared areas, circulation and building services. The chosen category affects dimensions, equipment and services. Drawing the largest possible number of rooms before checking these conditions can mean having to redesign the layout.
Technical checks include fire safety and safety in use and accessibility. Depending on the work, the assessment covers escape routes, entrances, changes in level, installations and adaptation of the existing building. Acoustic, health and hygiene requirements and any applicable heritage protection conditions must also be coordinated.
To prepare an initial assessment, gather:
- The exact address and available ownership or lease documentation.
- Current plans and photographs, including entrances, stairs and affected shared areas.
- Previous licences, projects and administrative decisions, if available.
- The accommodation type, intended category and proposed capacity.
- Any requests received from the authorities and the current status of the application.
This list helps define the commission; the final documentation depends on the proposed work. See our accommodation project and activity licence service.
3. Address municipal authorisations and the tourism declaration
The municipal procedure considers the proposed activity and the relevant building works. Planning rules may require additional studies. For example, an ERIU for accommodation is considered where the rules governing permitted uses require it; it is not automatically commissioned for every accommodation project.
The operator submits a declaration of responsibility for starting the activity to the Community of Madrid. This identifies the establishment and declares that the requirements are met and that supporting documentation is available. Compliance must be maintained throughout operation. This regional procedure does not replace municipal permissions or any other authorisations that apply.
Timescales, costs and preparations for opening
A programme can only be established after reviewing the property’s situation, the works and the procedures required. A useful programme separates feasibility, design, applications, construction and final documentation; it does not promise an opening date before the application has been assessed.
The budget should also distinguish professional fees, building works and installations, applicable fees or taxes, and additional reports. The regional administration states that its tourism declaration carries no administrative fee; this does not make the whole project or the municipal procedures free.
Before welcoming guests, also review customer information, operating conditions and guest reporting obligations. These are separate from the licence and the technical project. The official information on tourist accommodation explains obligations for the chosen category.
Where should you start with your hotel or hostal?
Send us the location and the documentation you have. We can explain which checks the property needs, what project can be considered and how to define the architectural and application work. If you are still comparing premises or buildings, start with feasibility before committing to the investment.