What is a geotechnical study? 5 things to consider before commissioning one
If you are building a home, you need to understand how the ground supporting its foundations will behave. The geotechnical study provides this information for the design: it is not a token administrative step and cannot be replaced by simply ‘making the foundations bigger’.
What is a geotechnical study?
It is the body of information and interpretation about the soil, groundwater and surroundings of the plot needed to analyse and size the foundations. Under CTE DB-SE-C, ground investigations are tailored to the building’s significance, the complexity of the ground and the existing information available.
What is its purpose before building a house?
It allows the foundation type to be selected and justified, excavation to be planned, and conditions affecting the works or neighbouring properties to be identified. It should be undertaken early in the design process, before structural sizing is finalised, because its conclusions may change the proposed solution.
What does the report include?
It normally brings together plot information, relevant field and laboratory work, interpretation of the ground and recommendations for foundations and excavation. There is no identical number of boreholes or tests suitable for every plot; the scope is justified case by case under the CTE.
Who prepares the geotechnical study?
It may be authored by the designer, another qualified professional or, where appropriate, the architect directing the works. Specialist investigation and testing should be commissioned from suitable professionals and laboratories. At AMMPLIO, we coordinate this information with the house design; we do not present the study as a construction service.
Is it needed for every trench?
The geotechnical study needed to design a building’s foundations should not be confused with every small intervention in the ground. Its scope depends on the building and design. If you are buying a plot to build a home, consult the architect before fixing the design and budget.
What if it is missing or inadequate?
Designing without understanding the ground may require foundation revisions, change costs and delay decisions. There is no universal percentage cost increase or automatic consequence: it depends on the information available and what is discovered. We help identify the documentation needed from the outset so that you can proceed on an informed basis.