Saltar al contenido

Declarations of compliance for building work and opening premises: what are they?

 in Construction and Housing, News

Reviewed in September 2026 for Madrid city. A declaration of compliance allows certain works or activities to proceed without waiting for prior permission, but only where the activity falls within that framework and the required documents are submitted. It does not mean ‘do any work and report it afterwards’. Before work begins, AMMPLIO establishes whether a declaration of compliance, planning permission or no municipal procedure is appropriate.

What is a planning declaration of compliance?

The applicant declares, under their own responsibility, that the works comply with planning and sector-specific rules, that they hold documents proving this and that they will maintain those conditions. In Madrid city, Ordinance 6/2022 regulates planning licences and declarations of compliance. The authority may carry out subsequent checks and inspections; if it detects essential breaches, it may prevent the activity and require correction.

When is it used for building work?

It applies to activities subject to municipal control that are not reserved for licensing. Some straightforward interior works may fall outside both controls, while others require a licence because of their scope, the building’s protected status or the need for a design. An enclosure, change of use, structural intervention or commercial renovation cannot be classified merely by calling it ‘minor work’. We review the drawings and property before choosing the procedure. The Council’s declaration of compliance page sets out the cases and documents.

What about opening premises or establishing a business activity?

Some activities also proceed through a declaration of compliance, while others need a licence because of their characteristics or risks. Where both building work and an activity are involved, the application is assessed as a whole. There is no universal list of ten compulsory documents for every commercial unit: designs, reports, certificates, taxes and supporting evidence depend on the proposal.

Do not confuse the municipal declaration with the tourism declaration

The holiday rental property declaration of compliance submitted to the Community of Madrid is a regional procedure distinct from the Council’s planning declaration of compliance. It is accompanied by a CIVUT and does not replace the municipal activity and operating licence required in Madrid city. If you want to open a VUT, see our guide to regularising a holiday rental property.

When can I start?

A planning declaration of compliance takes effect when entered in the municipal register with all required documents and conditions satisfied, without prejudice to subsequent checks. Some activities have additional conditions to meet before commencement, and some works require prior permission. We therefore do not recommend starting until the specific framework has been checked and the complete application prepared.

At AMMPLIO, we help define the procedure for your commercial premises or activity, completed building work or change of use. We explain our professional fees and technical scope before you commission us. Construction and materials are quoted separately by the party carrying out the work.

Leave a Comment

A house with cadastral information and a map indicating its cadastral value