Retrospective approval of unauthorised building work in Madrid

There are many situations in which we need to demonstrate the lawful status of a property or an alteration, such as when selling, letting or carrying out refurbishment and adaptation works.

legalizacion obra

Your service, step by step

Explore the requirements, scope and fees before taking the next step.

What is a retrospective approval project for completed building work?

Obtaining retrospective approval for completed building work is an administrative procedure intended to restore planning compliance, either voluntarily or at the authorities’ request. Its purpose is to verify whether the completed work complies with the planning provisions and regulations applicable when the retrospective approval licence is requested.

A retrospective approval project for a building is a common procedure governed by most local councils and architects’ associations. The project describes the property’s current condition and its compliance with the regulations.

Why choose Ammplio Arquitectos for retrospective approval of building work?

At Ammplio, we have handled many retrospective approval procedures for completed work, both within and outside planning conformity. We have the experience you need and can anticipate the problems that may arise. We will explain the whole procedure clearly and transparently from the outset, so that you can make an informed decision.

Our professional fee covers the scope stated alongside the price. The estimate sets out any additional stages and included or excluded expenses . We also believe in transparency, so our fee for obtaining retrospective approval is itemised. You can adjust your quote and add or remove items if necessary, including any work you have already completed.

Work carried out on a property without a licence can obtain retrospective approval if it complies with the applicable regulations or can be adapted to comply. The procedure is known as an ‘expediente de legalización de obra consolidada’. This project must meet the regulations and demonstrate compliance with the current planning rules. It is therefore important to work with qualified professionals who can certify your project. If you find yourself in this situation, contact us to bring your property’s position up to date.

What happens when the enforcement limitation period has expired?

The expiry of the enforcement limitation period for completed work does not automatically mean that the limitation period for an administrative offence or penalty has expired, nor that the work is lawful; the time limits and their calculation differ. To obtain retrospective approval after the enforcement limitation period has expired, for example to add floor area, consolidate a mezzanine or regularise an enclosure, planning compatibility must be assessed and approval sought where appropriate, regardless of any potential penalties.

Requirements for retrospective approval of work carried out without a licence

HOW TO REGULARISE YOUR PROPERTY AND COMPLETED WORK WITH CONFIDENCE

Retrospective approval of completed work is an administrative procedure to ensure that all the legal requirements of the Technical Building Code, General Plan and other applicable regulations are met for the property’s intended use.

The work may be complete, partly complete, poorly executed or still to be carried out. The procedures can vary in each case, so we advise you from the outset on the full process, based on a detailed study of the situation. As this is a technical and administrative procedure, the project must be prepared by a suitably qualified professional.

To obtain retrospective approval for work outside planning conformity or carried out without a licence, a series of requirements laid down in municipal planning licence ordinances must be met.

REQUIREMENTS FOR RETROSPECTIVE APPROVAL OF WORK CARRIED OUT WITHOUT A PROJECT

Retrospective approval for work carried out without a licence requires a suitably qualified professional who belongs to the relevant professional association to prepare the project. The type of documentation required depends on the extent of the breach.

In general, a series of requirements must be met to obtain retrospective approval for completed work:

  • Meet habitability requirements, in the case of a dwelling.
  • Comply with planning regulations.
  • Comply with the sector-specific regulations for the property’s use.
  • Comply with the Technical Building Code (CTE).
  • Comply with the Regulation on Thermal Installations in Buildings (RITE).

Although all regulations must be met, this can sometimes be difficult, particularly if the work was carried out many years ago. In that case, the requirements will be determined by the local council and usually concern planning regulations.

 

Documents needed to assess completed work

To regularise the property and the completed work, the property must comply with the planning regulations, the Technical Building Code and the minimum habitability and safety requirements for its use.

Before starting any procedure, we will request documents to help us prepare the retrospective approval project or dossier, such as the Building Logbook with its construction project, contracts, certificate of age and any other existing information about the building.

The procedures, requirements and needs vary according to the condition or type of work. If it does not comply with the regulations, a second stage of building work will be needed to obtain the licence. In general, however, the requirements for retrospective approval of building work will be the same as those that would apply if construction were starting now.

Finally, to obtain retrospective approval and the licence, we will prepare a retrospective approval project or retrospective approval dossier ,  to be professionally endorsed by the architects’ association where mandatory or included in the appointment. This project is submitted to the local council with supporting documents for its approval.

VIEW THE DIFFERENT SITUATIONS THAT MAY APPLY TO THE WORK

There are three possible situations:

1. The work carried out without a licence complies with the regulations

In this case, the licence application, project and final works certificate are submitted, and the fees and taxes applicable under the council’s ordinance and to the intervention must be paid. The licence will be granted after a period of time.

2. The work does not comply with the regulations but can be adapted through refurbishment

In this case, further work is required, so the retrospective approval project will contain additional sections and architectural site supervision, also signed by an architect, will be needed. A new building licence must therefore be requested, with the corresponding fees paid. The work must then be carried out, and a final works certificate issued on completion.

3. The work carried out without a licence does not comply with the regulations

In this case, the licence will not be granted and there is no point in submitting a retrospective approval project, which is why a preliminary feasibility study is essential. If this is the situation, the applicable enforcement periods must be checked: in the Community of Madrid, generally six years and fifteen years on protected non-developable land, with some cases subject to no time limit and a review of the transitional rules for older work. Expiry of the period does not make the work lawful.

Once we have reviewed the condition of the partly or fully completed work and whether it meets the applicable regulations, our team will prepare all the documents required for this procedure. Our procedure shows you THE CORRECT WAY to obtain retrospective approval for completed work.

What our retrospective approval dossier includes

Your estimate details the technical work and administrative services included, so you know the scope and price before we begin. Construction-stage services and external charges are quoted separately where required.

Study and technical documents

1  Feasibility study:

  • Survey of the property and preparation of drawings. Depending on the state of the work, drawings of the original and/or altered condition will be prepared.
  • Consultation with the relevant district planning information service on specific conditions
Study and technical documents

2  Professionally endorsed technical and construction report

  • Descriptive and technical report
  • Demonstration of compliance with mandatory regulations
  • Annex on consolidation of the structural design, where applicable
Study and technical documents

3  Professionally endorsed drawings

  • Floor plans of the altered condition and, where relevant, the original condition
  • Elevations of the altered condition and, where relevant, the original condition
  • Sections of the altered condition and, where relevant, the original condition
  • Building services drawings of the altered condition and, where relevant, the original condition
  • Structural floor plans and sections of the altered condition, where applicable
Study and technical documents

4  Itemised estimated cost assessment

Administration

5  Planning authorisation

  • Management of the appropriate planning authorisation: a licence or declaration of compliance, depending on the intervention, works and property conditions
  • Preparation and management of all official and administrative documents required by the local council
Works

6  Completion of works, where applicable

  • Preparation of the final works certificate, endorsed by the Official Architects’ Association of Madrid
Study and technical documents

7  Change of use in the Cadastre, optional

  • Management and processing of the cadastral amendment
Administration

8  Management of the appropriate first occupation procedure: a licence or declaration of compliance according to the municipality and intervention, optional

  • Preparation and management of all official and administrative documents required by the local council to grant the first occupation licence (LPO)

How much does a retrospective approval dossier cost?

Architect’s fees for retrospective approval of completed work vary according to its scope and complexity. This is our fee for retrospective approval of work carried out without a project:

* Minimum fee for a property of up to 75 m². Enter your floor area to see your price. VAT excluded.

Would you like a quote for retrospective approval of building work?

Write to us and tell us about your building work

    I have read and accept the privacy policy and legal notice.