Property subdivision projects in Madrid: homes, commercial premises and offices

If you own commercial premises or a home that you want to subdivide, Ammplio’s architects specialise in subdividing homes and offices. We provide all the assurances you need to carry out the work.

Property subdivision: an entrance hall branches towards two separate residential doors, with a floor plan showing the division.

Your service, step by step

Explore the requirements, scope and fees before taking the next step.

What are the requirements for subdividing a home or commercial premises?

HOW TO DIVIDE COMMERCIAL PREMISES OR A HOME WITH CONFIDENCE

Dividing commercial premises or a home is an administrative procedure to ensure that the resulting dwellings or premises meet all the legal requirements of the Technical Building Code, General Plan and other regulations. Subdivision (segregación) and division (división) of properties, including commercial premises, homes, warehouses and storage rooms, are different administrative processes but produce similar results. Subdivision means ‘separating off’ part of a property to create a new property: the original retains its characteristics but becomes smaller. Division means splitting the property into two new properties whose characteristics need not be the same as the original’s. For practical purposes, we therefore use the terms together.

Subdivision or division will generally involve refurbishing the property and creating independent units. The appropriate first occupation or operating procedure must therefore be completed in accordance with the authorising instrument, and the project must be prepared by an architect .

 

What is the procedure for subdividing a property, and what does the subdivision service include?

Your estimate details the technical work and administrative services included, so you know the scope and price before we begin. Construction-stage services and external charges are quoted separately where required.

Why choose Ammplio Arquitectos to subdivide your property?

Ammplio is an architectural practice specialising in property subdivision. We have the experience you need and can anticipate the problems that may arise. We will explain the whole procedure clearly and transparently from the outset, so that you can make an informed decision.

Our professional fee covers the scope stated alongside the price. The estimate sets out any additional stages and included or excluded expenses . We also believe in transparency, so our fee for subdividing a property is itemised. You can adjust your quote and add or remove items if necessary, including any work you have already completed.

Dividing a property is feasible in most cases, provided the minimum floor areas are available. However, the requirements laid down in the General Urban Development Plan must be met, and the details of the property and building need careful study. The process includes an administrative stage, in which we handle all the necessary documents, and a construction stage, in which the properties are separated in accordance with the subdivision project.

What does dividing a home mean?

Subdividing a home or dividing a flat is a procedure that separates one dwelling into two or more. The same procedure can be used to separate commercial premises from a home or divide any other property. Each resulting property must comply individually with the regulations applicable to it. The properties become separate entries in the Land Registry and the Cadastre and are also physically separated, except in the case of commercial activities, where separation in the Land Registry may be possible without physical separation.

This means that if you want to separate a dwelling from commercial premises, taking space from the premises to create a home within them, the resulting dwelling must meet the minimum housing requirements and the remaining commercial premises must also meet their applicable regulations. Each unit created by dividing the original office, commercial premises, house or other property must comply independently with its own regulations.

The same applies when separating commercial premises from a home: the new premises must comply with the regulations, and the original home, now smaller, must continue to meet the requirements for a dwelling.

REQUIREMENTS FOR SUBDIVIDING A HOME OR COMMERCIAL PREMISES

VIEW REQUIREMENTS FOR SUBDIVIDING A PROPERTY INTO TWO OR MORE DWELLINGS

Requirements for subdividing a home

 

The following requirements apply to the municipality of Madrid. The residential provisions of the Planning Regulations (NNUU) apply to new buildings, general restructuring and, in all cases, the conversion of commercial premises into dwellings; for other works, their applicability depends on the extent of the intervention. The project also demonstrates compliance with the CTE according to the change of use and the proposed works. In existing buildings, any limitations must be justified and the greatest effective level of compliance possible achieved in the circumstances permitted by the CTE. In other municipalities, we review their own planning provisions and ordinances.

1  Outward-facing dwelling:

All dwellings must qualify as outward-facing and meet the following hygiene and safety requirements:

  1. Hygiene: occupy a façade length of more than 3 metres, with at least one opening serving a habitable room. That room must have a usable floor area greater than 12 m², excluding any enclosed projecting bay, and accommodate a circle with a diameter of at least 270 cm, tangent to the wall containing the opening for light and ventilation. The opening must face:

a)      A public street or public open space.

b) A private space within the plot, located above the horizontal plane at the room’s floor level, provided that it meets the position, dimensions and separation requirements in Article 7.3.3 of the NNUU for the relevant building type. Not every courtyard qualifies a dwelling as outward-facing.

2. Safety: it must comply with the accessibility and fire prevention safety requirements established by sector-specific or other applicable regulations.

2  Dwelling accommodation requirements:

An ordinary minimum dwelling comprises a living/dining room, kitchen, bedroom and bathroom, with a usable floor area of at least 40 m². Terraces, balconies, continuous balconies, enclosed projecting bays, drying areas and spaces with a clear height below 220 cm are excluded. Open-plan dwellings with this minimum floor area are permitted, provided the bathroom is enclosed. Special housing types and protected housing have their own requirements.

The different rooms making up the dwelling are considered habitable rooms, except WCs, entrance halls, corridors, drying areas and similar spaces. The minimum requirements for the rooms in a dwelling are:

a) Kitchen and main rooms: the kitchen must have at least 7 m² of usable floor area and accommodate a circle 160 cm in diameter; the living/dining room, 14 m² and a 300 cm circle; the main bedroom, 12 m² and a 270 cm circle; and additional bedrooms, 7 m² and a 200 cm circle. The circles in the living room and bedrooms must be tangent to the wall containing the main opening. The kitchen may be integrated into the living/dining room without floor-to-ceiling partitions, retaining the combined area of both spaces. The bathroom must have at least 3 m² and a bath or shower, washbasin and toilet; one bathroom must be accessible independently of the kitchen and bedrooms. Cooking-area extraction must be mechanical and independent of the general ventilation system, in accordance with the CTE.

b) Corridors: must have a minimum clear width of 90 cm. Local reductions of up to 15 cm are permitted over a maximum length of 30 cm, and never opposite a doorway. Accessible dwellings must also comply with the specific dimensions in the CTE and the applicable regional regulations.

c) Clothes-drying area: this is optional and may be located within the dwelling or in a shared area of the building. If inside the dwelling, it must have a minimum usable floor area of 3 m², direct natural ventilation and screening that restricts views of the laundry from public space. It may not be incorporated into balconies or continuous balconies.

d) Storage room : a non-habitable room for storing household belongings.

  

3  Clear height:

The minimum clear height of habitable rooms, except the kitchen, is 250 cm. This may only be reduced exceptionally to 220 cm beneath isolated projections of the structure or building services. In kitchens and non-habitable rooms, the minimum clear height is 220 cm.

 

4  Dimensions of access openings:

The dwelling’s entrance door must provide a minimum clear opening 80 cm wide and 200 cm high.

Internal door leaves must have minimum dimensions of 203 cm high and 72.5 cm wide, including bathroom doors. Accessible dwellings must also meet the specific accessibility requirements.

 

5  Ventilation and lighting requirements for habitable and non-habitable rooms in residential use :

Every habitable room must qualify as an outward-facing room and meet the NNUU natural lighting requirements. The project will also check the courtyard and opening requirements applicable to the building.

a) The natural lighting openings must have an area of at least 12% of the usable floor area of the habitable room.

b) Ventilation: the dwelling must have the general hybrid or mechanical ventilation system required by the CTE. For supplementary natural ventilation, kitchens, dining rooms, bedrooms and living rooms must have openable external windows or doors with a total area of at least 5% of the room’s usable floor area.

Ventilation for bathrooms, WCs and other non-habitable rooms must comply with the CTE according to the type of space. In bathrooms and WCs, extraction forms part of the dwelling’s general ventilation system; a window does not replace it.

No newly created dwelling may have its floor, even partly, below the adjoining ground level, or have any room on a storey below the ground floor. In single-family homes, rooms may be located on the floor immediately below if they meet natural ventilation and lighting requirements. If a sunken lightwell is proposed, its width must be at least one third of the height H defined in the NNUU and never less than 3 m. We check these conditions and the admissibility of each proposal.

VIEW REQUIREMENTS FOR SUBDIVIDING A PROPERTY INTO TWO OR MORE COMMERCIAL UNITS

Requirements for dividing commercial premises

 

The resulting premises must comply with municipal planning provisions, the CTE and the sector-specific regulations applicable to their activity. These references apply to the municipality of Madrid; in other municipalities, we check their own rules. In existing buildings, we justify the extent of the requirements and, where applicable, the solutions for effective compliance permitted by the regulations.

1  Feasibility and permitted use:

For all commercial premises, it is necessary to verify that the use or activity is permitted. Most uses are compatible or admissible on the ground floor, but every case must be checked in detail, as some areas have restrictions according to the activity, such as restaurants or workshops. On first and higher floors, unless the premises are offices, professional practices or consulting rooms, their entrance must be independent of the residential entrance hall.

The Licensing Management Agency (AGLA) will verify the feasibility of the new activity and its requirements. We handle this procedure for you.

 

2  Requirements for the premises: heights, stairs, basements and mezzanines.

a) Minimum clear height: the NNUU generally require 2.50 m in habitable rooms and 2.20 m in non-habitable rooms, without prejudice to the requirements for each use. Workplace regulations require 3 m, with a reduction to 2.50 m permitted in commercial premises, service premises, offices and professional practices. We check the planning and workplace requirements applicable to each area.

b) Mezzanines and basements: we review their planning status, whether the proposed use is permitted, and the requirements for height, ventilation, accessibility and evacuation. Their inclusion in an earlier licence does not automatically authorise any new use. If they have no authorisation, we check whether retrospective approval is possible under the planning rules.

c) Stairs: must meet minimum dimensions:

– General-use stairs: a minimum going of 28 cm and a rise of between 13 and 18.5 cm; in public-use areas, or where no alternative lift is available, the maximum rise is 17.5 cm. The width is calculated according to the use, users and evacuation requirements; there is no universal minimum of 100 cm for all commercial premises. Accessibility and workplace safety requirements are also checked.

– Restricted-use stairs: the CTE permits a minimum width of 80 cm, a minimum going of 22 cm and a maximum rise of 20 cm only in areas meeting its definition of restricted use, not simply because the public is excluded. Minimum clear headroom is 2.20 m generally and 2.10 m for restricted use, without prejudice to the 2.20 m required by workplace regulations for stairs in workplaces.

 

3  Accessibility and access route:

An accessible route must generally have a minimum clear width of 1.20 m, with no steps, and doors providing a minimum clear opening of 80 cm. Local narrowing and other conditions must be justified under the CTE. In existing buildings, we study accessibility solutions and, where applicable, the justified effective compliance permitted by the regulations.

 

4  Toilets:

The provision of toilets and, where relevant, a toilet lobby depends on the activity, occupancy and health and workplace regulations. Where toilets are mandatory, the CTE requires at least one accessible toilet for every 10 WCs or fraction thereof, which may be shared by both sexes. The extent of adaptation in existing buildings must be justified; there is no general exemption for businesses with 50 employees or fewer.

 

5  Protection and heritage status: BIC, BIP and CPPHAN

Most buildings in historic centres have some degree of protection: partial, structural or comprehensive, in addition to designations as assets of cultural or heritage interest. The quickest and most advisable approach is to carry out work in keeping with their original condition, without alterations. However, several situations may arise:

– The protected element is in its original condition and no work is carried out on it: its protection status does not affect the work.

– The protected element is not in its original condition: restoration in accordance with the general criteria and the Heritage Commission’s requirements is recommended.

– Work is carried out on the protected element, or it is not restored to its original condition: a prior opinion and report from the Commission for the Protection of Historical, Artistic and Natural Heritage (CCPHAN) will be required. This is a more complex process.

 

6  Ventilation, smoke extraction, boilers and ovens:

Commercial premises must have ventilation appropriate to their use. In Madrid, separation distances for ventilation and air-conditioning outlets are determined by airflow and the position of receiving openings, under Annex II of the Air Quality and Sustainability Ordinance. For example, for flows from 0.2 to 1 m³/s: 2 m from openings on the same wall, 3.5 m from openings opposite in the circumstances defined by the ordinance, and 1.5 m in all other situations. The minimum height above circulation areas is 2.5 m, reducible to 2 m for flows below 0.2 m³/s.

Where smoke extraction to roof level is required, its height and separation distances must be calculated under the Air Quality and Sustainability Ordinance. On flat roofs or roofs with a slope below 20°, the duct must rise 1 m above the roofs of buildings within a radius of 15 m for outputs of up to 700 kW; the radius increases to 50 m for higher outputs. Obstacles and steeper roofs have specific rules. For boilers and water heaters, the RITE establishes discharge at roof level as the general solution: outlets through façades or into courtyards are permitted only in the expressly specified circumstances, for room-sealed gas appliances of up to 70 kW or natural-draught domestic hot water appliances of up to 24.4 kW. Alterations to existing systems without a suitable roof-level duct must also meet the relevant conditions, including NOx class 5 for individual boilers covered by the exception, and municipal regulations.

The municipal exception to discharge at roof level requires all appliances to be electric and to cook internally without releasing odours, with a combined nominal useful output of 4 kW or less, adequate maintenance and no openings to the outside except those required by sector-specific regulations. If odours nevertheless occur, the local council may require additional measures or discharge at roof level.

 

7  Fire safety:

These regulations can be summarised as follows:

– Escape corridors are sized according to occupancy, with a general minimum width of 1 m. The CTE permits 80 cm for a maximum of 10 regular users, but this exception does not reduce the widths required by accessibility or other applicable regulations, such as workplace rules.

– The permitted escape distance depends on the use, occupancy and number of exits. As a guide, where a single exit is permitted, the general limit is 25 m to the storey or room exit; this is not a universal rule of 25 m to the street. We check the conditions and exceptions in Table 3.1 of DB SI.

– Escape routes from evacuation starting points to a safe external space must have the emergency lighting required by the CTE.

– The fire protection equipment required for the use and floor area must be installed. In general, portable extinguishers must have a minimum rating of 21A-113B and be within a travel distance of 15 m from any evacuation starting point on the floor. Automatic kitchen fire suppression is required where the installed power exceeds 50 kW; for Hospital or Public Residential use, the threshold is 20 kW. The system must protect the cooking appliances: simply referring to the smoke extraction outlet is not sufficient.

Once we have checked that all these requirements are met and subdivision or division is feasible, our team will prepare the project and complete the documents. Our procedure shows you THE CORRECT WAY to carry out a subdivision:

THE PROCEDURE FOR SUBDIVIDING A HOME OR COMMERCIAL PREMISES

To obtain a building licence for property subdivision, with or without a change of use, the property must comply with the planning regulations, the Technical Building Code and the minimum habitability and safety requirements for its new use.

When dividing the property, you must also check that it is not prohibited by the Horizontal Property Act or the planning regulations themselves . Each local council’s General Urban Development Plan determines compatible changes of use, permitted uses and principal uses. Since residential use is generally the principal use of most buildings, subdividing homes is often administratively feasible. This also applies to commercial premises and properties, although intensification of use or exhaustion of the permitted capacity must be considered. We check this for you.

Where the owners’ association’s statutes do not set out a regime for subdividing or dividing properties, which is uncommon, permission must be requested and the division approved at a meeting by three fifths of all owners, representing at the same time three fifths of the ownership shares. The meeting establishes the new ownership shares for the resulting properties. Bear in mind that no common elements may be altered.

Finally, dividing or subdividing the property requires a technical project, signed by an architect and endorsed by the architects’ association where mandatory or included in the appointment, demonstrating compliance with all applicable regulations. A single project covers the entire procedure, including the subdivision and any intended new use. It is submitted to the local council with supporting documents for approval of the division and the subsequent appropriate first occupation or operating procedure. The purpose must already be specified when applying for the building licence, for example: ‘subdivision of commercial premises into two dwellings’ or ‘subdivision of a dwelling to create commercial premises’.

Once the subdivision has been authorised and the appropriate first occupation procedure completed, notarial deeds for the new properties must be drawn up and lodged with the Land Registry.

 

Study and technical documents

1  Feasibility study:

  • Survey of the property and preparation of existing-condition drawings
  • Consultation with the relevant district planning information service on specific conditions
Study and technical documents

2  Basic and detailed design project

  • Study of different layout options for the new properties
  • Site and location plan
  • General floor plans
  • Elevations and sections
  • Descriptive and technical report
  • General and project-specific specifications
  • Quantities and cost estimates
Administration

3  Planning authorisation

  • Management of the planning authorisation for subdivision or division: a licence or declaration of compliance, depending on the intervention, works and property conditions
  • Preparation and management of all official documents required by the council
Works

4  Architectural site supervision

  • Direction and supervision of the work in accordance with the design and regulations
Works

5  Completion of works

  • Preparation of the final works certificate, endorsed by the Official Architects’ Association of Madrid
Study and technical documents

6  Cadastral amendment

  • Management and processing of the cadastral amendment arising from the subdivision and, where applicable, the change of use
Study and technical documents

7  First occupation or operating procedure

  • Management and processing of the appropriate first occupation or operating procedure in accordance with the authorising instrument and works certificate

How much does a project to subdivide a home or commercial premises cost?

Fees for the property subdivision procedure described vary according to the size, complexity and scope of the project. This is our fee for subdividing a house, commercial premises or office:

* Minimum fee for a property of up to 75 m². Enter your floor area to see your price. VAT excluded.

Would you like a quote to subdivide your property?

Write to us and tell us about your project

    I have read and accept the privacy policy and legal notice.