Land-Use Implementation Impact Study (ERIU) in Madrid

In the city of Madrid, introducing certain uses on a plot or in a building requires a detailed check of compatibility with the surroundings and current regulations. In the cases specified by the Planning Regulations, a Land-Use Implementation Impact Study (Estudio de Repercusión por Implantación de Usos, ERIU) is mandatory. This technical document assesses the proposed activity’s planning impact.

Edificio urbano con fachada en esquina y balcones

Your service, step by step

Explore the requirements, scope and fees before taking the next step.

What is an ERIU?

The Land-Use Implementation Impact Study (ERIU) is a report required in Madrid to assess the planning impact of certain uses on a plot or in a building. Its purpose is to ensure that a new activity is compatible with its surroundings and current regulations, supporting appropriate urban planning. The study is crucial to preventing potential planning conflicts and ensuring sustainable development in the city.

The ERIU considers factors such as mobility, accessibility, the balance of uses in the area and compliance with the planning parameters required by Madrid City Council. The study’s requirements can vary according to the proposed use and may include additional noise or environmental impact reports. This document must be prepared by a Architect.

What is the procedure for changing a building’s use, and what does the ERIU submission service include?

REMEMBER: AMMPLIO ARCHITECTS’ SERVICES INCLUDE ALL PROCEDURES THROUGH TO PROJECT COMPLETION. WE ARE TRANSPARENT FROM THE OUTSET, SO YOU KNOW EVERY REQUIRED STEP AND ITS FEE.

Why choose Ammplio Arquitectos to prepare your building’s ERIU?

Our team of architects and urban planners at AMMPLIO ARQUITECTOS has extensive experience preparing and processing ERIU studies. We ensure that every report meets all legal requirements, helping avoid administrative problems and streamline the approval process.

We also offer a comprehensive service covering an initial feasibility assessment, submission to the competent authority, Madrid City Council, and support throughout the process. We adapt to each client’s specific needs, providing tailored advice and effective solutions to obtain ERIU approval through sound technical justification and a complete response to requests for further information.

This study is essential in cases such as opening commercial establishments, adapting buildings to new uses or introducing accommodation activities. A properly prepared ERIU supports the necessary permit applications and helps prevent administrative problems and supports orderly, sustainable urban development. The articles of Madrid’s Planning Regulations governing the ERIU came into force on 27 November 2023.

When is an ERIU required and what are its requirements?

HOW TO HANDLE YOUR BUILDING’S ERIU FOR A CHANGE OF USE WITH CONFIDENCE

 

Preparing an ERIU requires the following documentation to be gathered and submitted:

    • Supporting report with a detailed analysis of the proposed use.
    • Assessment of compliance with municipal regulations.
    • Graphic documentation including location and layout plans.
    • Mobility and accessibility report.
    • Additional studies, where required, such as environmental impact or demands on urban infrastructure.
    • Analysis of effects on the urban surroundings, including the concentration of uses and compatibility with existing activities.
    • Justification of how the new use integrates into the area’s activity patterns.

Each document is essential to demonstrating the proposed use’s feasibility and compatibility with its surroundings.

Introducing accommodation activities and the need for an ERIU

 

For accommodation activities, particularly entire buildings intended for hotel use or tourist apartments, an ERIU is required in Madrid where the proposal falls within the cases specified in the Planning Regulations, according to the use, plot and applicable planning framework. The study assesses the impact on mobility, the balance of surrounding uses and coexistence with residential or commercial activities.

For accommodation, we check the conditions of Plan RESIDE and whether an ERIU, special plan or other procedure applies, also considering valid existing authorisations.

Specific requirements for introducing accommodation include:

  • Analysis of the impact on the concentration of uses and services in the area.
  • Assessment of accessibility and the building’s compliance with current regulations.
  • A plan to mitigate potential negative effects on the urban surroundings.
  • Demonstration of compliance with sustainability and habitability criteria.
  • Specific noise and environmental impact studies, where required.
  • Assessment of accommodation capacity and its relationship with existing demand in the area.

 

BENEFITS OF THE PROCEDURE:

 

An ERIU is more than a regulatory requirement; it also offers significant benefits:

  • It ensures compatibility between the proposed use and the urban surroundings.
  • It reduces legal risks and administrative penalties.
  • It identifies and allows correction of potential negative impacts before the activity begins.
  • It supports balanced, sustainable urban planning.
  • It builds confidence among public authorities, investors and property owners.

Once we have checked that all the requirements are met, our team prepares the study and completes the documentation. Our procedure shows you THE CORRECT WAY to handle a LAND-USE IMPLEMENTATION IMPACT STUDY in Madrid.

Study and technical documents

1  Initial analysis:

  • Review of applicable regulations.
  • Assessment of the site and its context.
  • Identification of potential planning restrictions.
  • Feasibility analysis and compliance with the General Urban Development Plan.
Study and technical documents

2 Preparation of the report

  • Description of the proposed use and justification of its feasibility.
  • Analysis of the impact on mobility, accessibility and urban functioning.
  • Inclusion of technical documents and drawings.
  • Proposed mitigation measures, where needed.
  • Development of strategies to minimise environmental and noise impacts.
Study and technical documents

3 Submission and processing

  • Submission to Madrid City Council.
  • Review and any requests for additional documentation.
  • Administrative decision and validation of the study.
  • Monitoring the process and responding to any changes requested by the authorities.

 

Completing each stage is essential to keeping the process moving and avoiding delays in the study’s approval.

How much does an ERIU cost and how long does processing take?

An architect’s fees for the procedure described vary according to the project’s size and scope. This is our fee for a building’s ERIU:

  • Processing time: 2–4 months, depending on the proposed use and the municipal decision. Requests for additional documentation may extend the period. In our experience, decisions are often issued before the proposed timeframe.
  • Estimated cost: This varies according to the study’s complexity and professional fees. Factors such as location and activity type can affect the final quote.
  • Factors that can affect the cost: Specific regulatory requirements, the need for additional environmental, noise or mobility studies, and the number of administrative procedures required.

* Fee for a property of up to 600 m².

* Professional endorsement fee included. Excludes VAT at 21%, planning service fees, the Construction, Installations and Works Tax (ICIO), waste management deposit and similar charges. We will tell you their amounts before starting.

Do you need an ERIU to move your project forward? Check our fees and commission the study.