Planning to refurbish your home with professional architects? At Ammplio Arquitectos, we design your refurbishment and supervise the entire process from start to finish. We help you achieve the best design, arrange the necessary licences and bring the project to life, with professional support throughout.

Home and Office Refurbishment Design and Licences

Your service, step by step

Explore the requirements, scope and fees before taking the next step.

What is a refurbishment, and which licences does it require?

Refurbishment is one of the most common ways to improve a property. This type of work may change the built floor area;  affect a structural element or add a facility that was not previously present. Whether a licence is needed, and which type, depends on the scope and scale of the work.

Refurbishments such as changing the internal layout with non-structural partitions can be processed through a declaration of compliance, provided they do not substantially alter the external configuration, volume or structural system, change the building’s principal use or affect protected elements. A report, drawings and technical justification for the work are submitted. Home refurbishments that require a statutory building design package because of their scope, such as a substantial alteration to the overall structural system, follow the licence procedure. Affecting a shared element does not, on its own, determine the procedure.

There are three situations when refurbishing in the municipality of Madrid: work requiring neither a licence nor a declaration of compliance; work processed through a declaration of compliance; and work requiring a licence. Whether a statutory design package or technical report is needed is also determined by the scope of the intervention.

What are the refurbishment requirements, and which licence is needed for its scope?

A refurbishment may include work that requires a statutory building design package and work that does not. To explain the scope, we distinguish between basic refurbishment, intermediate refurbishment and complete refurbishment with a statutory design package. These three descriptions do not replace the municipal classification: in Madrid, an intervention may require neither a licence nor a declaration of compliance, may require a declaration of compliance, or may need a licence. We apply Ordinance 6/2022 on Planning Licences and Declarations of Compliance (OLDRUAM), together with the design criteria in Article 2.2 of the Building Regulation Act. Here are the works and conditions included in each group:

 

1. Basic refurbishment: maintenance and replacement of internal finishes

Maintenance work limited to replacing internal finishes in a home or commercial premises requires neither a licence nor a declaration of compliance in Madrid where protected elements are not affected. That limited scope does not require a statutory building design package either. Waste removal or occupation of the public highway may still require separate authorisation.

The main works in a basic refurbishment include the following maintenance of internal finishes, subject to the conditions above:

  • Painting ceilings and walls
  • Replacing the flooring in the property
  • Improving the plasterwork and finishes on walls and ceilings
  • Replacing wall tiles in bathrooms and kitchens
  • Renewing building services that are already authorised, in the same position, with similar dimensions and without increasing their planning or environmental requirements. Any certificates or installation certificates required by the regulations for each system remain necessary.

 

2. Intermediate refurbishment: internal layout changes and technical documentation

A refurbishment that rearranges non-structural partitions without substantially altering the external configuration, volume or structural system, changing the principal use or affecting protected parts does not require an LOE building design package. In Madrid, it follows the declaration of compliance procedure unless another licence requirement applies. It does require sufficient technical documentation: a report, drawings and justification of the affected conditions, signed by a suitably qualified professional.

The main works in an intermediate refurbishment include the following, combined with internal layout changes:

  • Replacing finishes in the home as part of the refurbishment; their replacement alone follows the maintenance regime described above.
  • Modifying or relocating  building services  in the home, as distinct from the straightforward equivalent renewal described in the previous group.
  • Changing the layout of the home using non-structural partitions, without work on load-bearing walls, floor structures or protected elements, and without changing the principal use.
  • Exterior  work, air conditioning, aerials, marquees, cabins, scaffolding and lifting platforms are classified according to the specific intervention. They do not automatically follow the same procedure: equivalent renewal of an installation may be exempt, while a marquee for a temporary activity or a temporary building may require a licence. Scaffolding and platforms also require assembly and dismantling documentation and, if they occupy the street, occupation authorisation.

For the internal layout change described, the procedure is:

  • A declaration of compliance with the relevant technical documentation.

 

3. Complete refurbishment with a statutory design package: larger-scale interventions

These refurbishments require a statutory building design package when the intervention meets any of the following criteria:

  • An intervention affecting the whole building or a substantial change to its overall external composition, volume or overall structural system; for example, an extension or structural replacement that meets those criteria.
  • A change to the building’s principal use, an intervention affecting the whole of a protected building, or a partial intervention affecting its protected parts. Affecting more than one dwelling is not, on its own, the design criterion under Article 2.2 of the LOE.

For the residential refurbishments described that require a statutory building design package, the procedure is:

  • A planning/building licence. Work in commercial premises subject to the special regime for stimulating commercial activity is classified separately.

For these refurbishments, you must submit:

  • A statutory building design package prepared by a suitably qualified professional. The detailed construction design requires mandatory professional endorsement (visado) in the cases covered by Article 2 of Real Decreto 1000/2010; not every technical report or basic design package requires endorsement.

What are the professional fees for a basic refurbishment?

 

 

Professional fees for a basic refurbishment vary according to the size and scope of the proposal. These are our fees:

* The fee depends on the selected service and property. Check the minimum fee and floor-area bracket at the top of this page. VAT excluded; your estimate details any external charges.

What are the professional fees for an intermediate refurbishment?

 

Professional fees for an intermediate refurbishment vary according to the size and scope of the proposal. These are our fees:

* The fee depends on the selected service and property. Check the minimum fee and floor-area bracket at the top of this page. VAT excluded; your estimate details any external charges.

What are the professional fees for a complete refurbishment with a statutory design package?

 

Professional fees for a complete refurbishment with a statutory design package vary according to the size and scope of the proposal. These are our fees:

* The fee depends on the selected service and property. Check the minimum fee and floor-area bracket at the top of this page. VAT excluded; your estimate details any external charges.

Basic refurbishment

Maintenance and internal finishes

What does this basic refurbishment service include?

Why choose Ammplio Arquitectos to refurbish an apartment or office?

Our practice is committed to making your refurbishment a success. We handle building licence applications and anticipate problems that may arise. For that reason, we explain the entire procedure clearly and transparently from the outset, so that you can assess it properly.

Our professional fee covers the scope stated alongside the price. The estimate sets out any additional stages and included or excluded expenses . We also provide an itemised refurbishment fee proposal, which you can adjust by adding or removing items where appropriate or where work has already been completed.

If required, we will also obtain three quotations for the building work from three independent contractors, so you can compare them and choose the one you prefer.

When does refurbishing an office, apartment or commercial premises require a licence?

For an older house renovation, a complete apartment refurbishment, replacement of a floor structure in commercial premises or installation of a staircase, the actual scope of the work must be established. Replacing internal finishes is different from rearranging partitions, intervening in the structure or modifying protected elements. Below, we explain when a statutory building design package is needed and when other technical documentation is sufficient.

WORK THAT DOES NOT REQUIRE A STATUTORY BUILDING DESIGN PACKAGE:

Examples include painting, flooring, tiling and other internal finishes that do not affect protected elements. A change of layout using non-structural partitions can also proceed without a statutory building design package if it does not substantially alter the external configuration, volume or overall structural system, change the building’s principal use or affect protected parts. Such a layout change still requires technical documentation: a report, drawings and justification of the affected safety, accessibility and habitability conditions.

Within this category, simply replacing internal finishes requires neither a licence nor a declaration of compliance when the above conditions are met. Changing the layout with non-structural partitions follows the declaration of compliance procedure in the circumstances described. Exterior painting, renewing building services or work in bathrooms and kitchens does not, by itself, determine the procedure: a distinction must be made between maintaining finishes, relocating services, layout changes and effects on the façade or protected elements.

 

WORK THAT REQUIRES A STATUTORY BUILDING DESIGN PACKAGE:

A statutory building design package is required for interventions affecting the whole building and for partial interventions that substantially alter its overall external composition, volume or overall structural system, as well as those that change the building’s principal use. It is also required for interventions affecting the whole of a protected building and partial interventions affecting its protected parts. An increase in volume or structural replacement that meets those criteria requires a design package. Creating an opening in a load-bearing wall always requires the structural intervention to be defined and technically justified, but must not automatically be equated with altering the overall structural system. The design requirements and municipal procedure are related but distinct: a declaration of compliance may also require technical documentation or a design package in the cases provided for by law.

Which works require a design package, and which procedure applies in Madrid?

These criteria apply to the municipality of Madrid. The statutory building design package, technical documentation and municipal procedure are separate requirements. DR means declaración responsable (declaration of compliance), and LOE means Ley de Ordenación de la Edificación (Building Regulation Act).

On mobile, swipe the table to see all columns.

Work with and without a statutory design package: conditions and documentation
Proposed work Specific conditions Design package required? Municipal procedure
Painting interiors; replacing flooring, wall tiles or plaster Maintenance of internal finishes in a home or commercial premises, without affecting protected elements, the structure or the use. No statutory building design package or municipal technical documentation for maintenance alone. Neither a licence nor a DR is required in this situation; waste arrangements and occupation of the public highway require separate authorisation.
Renewing previously authorised building services Same location, similar dimensions and the same planning and environmental requirements. This is not the same as installing or relocating a system. No LOE building design package for renewal alone; certificates, installation certificates or sector-specific design packages where required for the installation. Exempt under OLDRUAM 6.d if these conditions are met.
Changing the layout with non-structural partitions No intervention affecting the whole building or substantial alteration of its exterior, volume or structural system; no change of principal use or effect on protected elements. Creating additional dwellings is not considered a simple layout change. No LOE building design package in this situation. A sufficient report, drawings and technical justification signed by a suitably qualified professional are required. DR, provided no other licence requirement under Annex I applies.
Intervention affecting the whole building; extension substantially increasing its volume; refurbishment substantially altering the overall structural system The criteria relate to the actual scope of the intervention, rather than whether an apartment refurbishment is marketed as a ‘complete renovation’. Yes, an LOE building design package. A licence for the residential refurbishment described. Certain commercial activities have a special regime under Ley 2/2012, so their premises are classified separately.
Creating an opening in a load-bearing wall, modifying columns or beams, or cutting through a floor structure A structural intervention must be defined and technically justified. An LOE design package is required when the intervention substantially alters the overall structural system; the name given to the work is not the determining factor. Signed structural technical documentation is required; an LOE building design package is needed if the preceding condition applies. A structural intervention is not a simple partition change. A licence if an LOE design package is required or protected elements are affected. A strictly localised intervention outside those circumstances must be justified as eligible for the DR procedure.
Work on protected parts of a listed building Intervention affecting the whole protected building, or part of it where that part is protected. Listed status does not automatically place all interior painting in this category. Yes, a building design package in the cases covered by Article 2.2.c of the LOE. A licence for the interventions described, with the applicable heritage controls.
Changing the building’s principal use A partial change of use that does not alter the building’s principal use is classified separately. Yes, an LOE design package for changing the principal use. A licence is generally required in this situation; partial uses must be classified separately, and accommodation use has its own specific licence requirement.
Scaffolding, lifting platforms, marquees or temporary cabins These are ancillary equipment or installations with their own rules; they do not all follow the same procedure as the internal refurbishment. Technical documentation and supervision of assembly and dismantling where applicable. They do not automatically require an LOE building design package. Scaffolding and platforms: documentation under Annex II.C.4 and occupation authorisation where applicable. Marquees for temporary activities and temporary buildings have specific licence requirements; they do not share a single prior-notification procedure.

Applicable legislation

Study and technical documents

1      Preliminary feasibility study

Measurements and layout survey of the home, including façade openings and doorways. Recording of available building services and utilities, where applicable. Preparation of a dimensioned scale drawing, with the layout and floor areas labelled

Study and technical documents

2    Proposed intervention 

Assessment of different finish options for the refurbished home. Preparation of the necessary drawings: plans, elevations, sections and building services for the existing and proposed conditions. Preparation of a report on the proposed work.

Study and technical documents

3    Site monitoring 

Monitoring of the work, on-site instructions and the visits needed for the work to progress correctly

Intermediate refurbishment

Internal layout changes and technical documentation

What does this intermediate refurbishment service include?

Study and technical documents

1      Preliminary feasibility study

Measurements and layout survey of the home, including façade openings and doorways. Recording of available building services and utilities. Preparation of a dimensioned scale drawing, with the layout and floor areas labelled. Enquiry to the relevant district planning information service to establish the specific conditions.

Study and technical documents

2    Proposed intervention 

Assessment of different finish options for the refurbished home. Preparation of the necessary drawings: plans, elevations, sections and building services for the existing and proposed conditions. Preparation of a descriptive report on the proposed work.

Study and technical documents

3    Descriptive report

Preparation of a descriptive report on the proposed work.

Study and technical documents

4    Cost estimate

Estimated budget for processing under the OLDRUAM ordinance.

Works

5    Site monitoring

Monitoring of the work, construction instructions and completion of the work.

Complete refurbishment

Larger-scale interventions with a statutory design package

What does this complete refurbishment service include?

Study and technical documents

1      Preliminary feasibility study

Measurements and layout survey of the home, including façade openings and doorways. Recording of available building services and utilities. Preparation of a dimensioned scale drawing, with the layout and floor areas labelled. Enquiry to the relevant district planning information service to establish the specific conditions.

Study and technical documents

2    Basic design and detailed construction design

Assessment of different layout options for the refurbished home. Preparation of the necessary drawings: plans, elevations, sections and building services for the existing and proposed conditions. Descriptive and technical report on the works. General and project-specific specifications. Quantities and cost estimate. Waste management. Compliance with mandatory regulations. Instructions for use and maintenance.

Study and technical documents

3    Basic health and safety study

Preparation of a basic health and safety study

Study and technical documents

4    Health and safety coordination

Monitoring and compliance with the basic health and safety study or full health and safety study, according to the statutory requirements applicable to the work. Up to 2 contractors

Works

5    Professional site supervision

Monitoring of the work to ensure that each stage progresses correctly, and issuing of certificates.

Works

6    Final completion certificate

Preparation of the final completion certificate, endorsed by COAM. Delivery of the certificate (CFO).