Commercial-to-residential change of use project in Madrid

Do you own commercial premises that you would like to convert into a home? At Ammplio Arquitectos, we specialise in changes of use. We assess the feasibility of your premises and develop the project around their planning and technical conditions.

Conversion of commercial premises into a home: a street-level interior retains traces of the former shopfront with residential privacy.

Can your premises become a home?

Explore the requirements, scope and fees before taking the next step.

What is a change of use?

A commercial-to-residential change of use is an administrative procedure to ensure that all the legal requirements of the Technical Building Code, General Plan and other regulations are met for the property’s intended new use.

A change of use will generally involve refurbishing the commercial premises and creating a dwelling. The appropriate first occupation procedure must therefore be completed in accordance with the authorising instrument and the design package must be prepared by an architect .

What are the requirements for converting commercial premises into a home?

HOW WE ASSESS A COMMERCIAL-TO-RESIDENTIAL CHANGE OF USE

A change of use involves more than a refurbishment project or a limited adaptation of a property. It also requires an administrative procedure that complies with municipal ordinances, the Technical Building Code and other mandatory regulations and instructions. The two must be coordinated so that the appropriate first occupation procedure can be completed in accordance with the authorising instrument. The procedure is similar for an office-to-residential change of use.

We have prepared this short information pack to help you check the requirements for a change of use:

What is the procedure for converting commercial premises into a home, and what does the change of use service include?

Your estimate details the technical work and administrative services included, so you know the scope and price before we begin. Construction-stage services and external charges are quoted separately where required.

Why choose Ammplio Arquitectos to convert commercial premises into a home?

Ammplio is a practice specialising in changes of use. We have completed commercial-to-residential changes of use for many properties, offices and commercial units. We have the experience you need and can anticipate the problems that may arise. We will explain the whole procedure clearly and transparently from the outset, so that you can make an informed decision.

Our professional fees are set out in the quote, together with the scope of the appointment and the costs included and excluded. We also believe in transparency, so our fee for converting commercial premises into a home is itemised. You can adjust your quote and add or remove items if necessary, including any work you have already completed.

We convert premises that meet the planning and technical requirements for residential use. The requirements laid down in Madrid’s General Urban Development Plan must be met, and the details of the proposed home and the building need careful study. The process includes an administrative stage, in which we handle all the necessary documents, and a construction stage, in which the property is adapted in accordance with the project.

* Minimum fee for a property of up to 75 m². Enter your floor area to see your price. VAT excluded.

REQUIREMENTS FOR A COMMERCIAL-TO-RESIDENTIAL CHANGE OF USE

VIEW COMMERCIAL-TO-RESIDENTIAL CHANGE OF USE REQUIREMENTS

The following requirements apply to the municipality of Madrid. The residential provisions of the Planning Regulations (NNUU) apply to new buildings, general restructuring and, in all cases, the conversion of commercial premises into dwellings; for other works, their applicability depends on the extent of the intervention. The project also demonstrates compliance with the CTE according to the change of use and the proposed works. In existing buildings, any limitations must be justified and the greatest effective level of compliance possible achieved in the circumstances permitted by the CTE. In other municipalities, we review their own planning provisions and ordinances.

1  Outward-facing dwelling:

All proposed dwellings must meet the conditions for an outward-facing dwelling, including the following health, hygiene and safety requirements:

  1. Hygiene: the dwelling must occupy a façade length of more than 3 metres, with at least one opening serving a habitable room. That room must have a usable floor area greater than 12 m², excluding any enclosed projecting bay, and accommodate a circle with a diameter of at least 270 cm, tangent to the wall containing the opening for light and ventilation. The opening must face:

a)      A public street or public open space .

b) A private space within the plot, located above the horizontal plane at the room’s floor level, provided that it meets the position, dimensions and separation requirements in Article 7.3.3 of the NNUU for the relevant building type. Not every courtyard qualifies a dwelling as outward-facing.

2. Safety: it must comply with the accessibility and safety requirements for fire prevention in the Technical Building Code, together with those established by sector-specific regulations.

2  Dwelling accommodation requirements:

An ordinary minimum dwelling comprises a living/dining room, kitchen, bedroom and bathroom, with a usable floor area of at least 40 m². Terraces, balconies, continuous balconies, enclosed projecting bays, drying areas and spaces with a clear height below 220 cm are excluded. Open-plan dwellings with this minimum floor area are permitted, provided the bathroom is enclosed. Special housing types and protected housing have their own requirements.

All rooms in the dwelling are considered habitable rooms, except entrance halls, WCs, drying areas, corridors and similar spaces. Their minimum requirements are:

a) Kitchen and main rooms: the kitchen must have at least 7 m² of usable floor area and accommodate a circle 160 cm in diameter; the living/dining room, 14 m² and a 300 cm circle; the main bedroom, 12 m² and a 270 cm circle; and additional bedrooms, 7 m² and a 200 cm circle. The circles in the living room and bedrooms must be tangent to the wall containing the main opening. The kitchen may be integrated into the living/dining room without floor-to-ceiling partitions, retaining the combined area of both spaces. The bathroom must have at least 3 m² and a bath or shower, washbasin and toilet; one bathroom must be accessible independently of the kitchen and bedrooms. Cooking-area extraction must be mechanical and independent of the general ventilation system, in accordance with the CTE.

b) Corridors: must have a minimum clear width of 90 cm. Local reductions of up to 15 cm are permitted over a maximum length of 30 cm, and never opposite a doorway. Accessible dwellings must also comply with the specific dimensions in the CTE and the applicable regional regulations.

c) Clothes-drying area: this is optional and may be located within the dwelling or in a shared area of the building. If inside the dwelling, it must have a minimum usable floor area of 3 m², direct natural ventilation and screening that restricts views of the laundry from public space. It may not be incorporated into balconies or continuous balconies.

d) Storage room: a non-habitable room for storing household belongings.

  

3  Clear height:

The minimum clear height of habitable rooms, except the kitchen, is 250 cm. This may only be reduced exceptionally to 220 cm beneath isolated projections of the structure or building services. In kitchens and non-habitable rooms, the minimum clear height is 220 cm.

 

4  Dimensions of access openings:

The dwelling’s entrance door must provide a minimum clear opening 80 cm wide and 200 cm high.

Internal door leaves must have minimum dimensions of 203 cm high and 72.5 cm wide, including bathroom doors. Accessible dwellings must also meet the specific accessibility requirements.

 

5  Ventilation and lighting requirements for habitable and non-habitable rooms in dwellings :

Every habitable room must qualify as an outward-facing room and meet the NNUU natural lighting requirements. The project will also check the courtyard and opening requirements applicable to the building.

a) Ventilation: the dwelling must have the general hybrid or mechanical ventilation system required by the CTE. For supplementary natural ventilation, kitchens, dining rooms, bedrooms and living rooms must have openable external windows or doors with a total area of at least 5% of the room’s usable floor area.

b) Natural lighting: the area of openings must be at least 12% of the usable floor area of each habitable room.

Ventilation for bathrooms, WCs and other non-habitable rooms must comply with the CTE according to the type of space. In bathrooms and WCs, extraction forms part of the dwelling’s general ventilation system; a window does not replace it.

No newly created dwelling may have its floor, even partly, below the adjoining ground level, or have any room on a storey below the ground floor. In single-family homes, rooms may be located on the floor immediately below if they meet natural ventilation and lighting requirements. If a sunken lightwell is proposed, its width must be at least one third of the height H defined in the NNUU and never less than 3 m. We check these conditions and the admissibility of each proposal.

Once we have checked that all these requirements are met and the change of use is feasible, our team will prepare the project and complete the documents. Our procedure shows you THE CORRECT WAY to carry out a change of use.

THE COMMERCIAL-TO-RESIDENTIAL CHANGE OF USE PROCEDURE

For a change of use from commercial to residential, or residential to commercial, the property must comply with the planning regulations, the Technical Building Code and the minimum habitability and safety requirements for its new use.

When changing the use, you must also check that it is not prohibited by the Horizontal Property Act or the planning regulations themselves. Each local council’s General Urban Development Plan determines compatible changes of use, permitted uses and principal uses. Since residential use is generally the principal use of most buildings, a change of use is often administratively feasible.

As regards the owners’ association, if the use is permitted, the change of use can proceed without the association’s approval. However, no common elements may be altered and the property’s ownership shares must remain unchanged. If such changes are necessary, the association’s approval will be required.

Finally, converting the premises into a home requires a technical change of use project, signed by an architect and endorsed by the architects’ association where mandatory or included in the appointment, demonstrating compliance with all applicable regulations. This project is submitted to the local council with supporting documents for approval of the change of use and the subsequent appropriate first occupation procedure.

Once the change has been authorised and the appropriate first occupation procedure completed, a notarial deed recording the change of use must be drawn up and lodged with the Land Registry.

Madrid City Council has specific municipal rules and guidance for changes of use. In other municipalities, their own planning provisions and ordinances must be reviewed.

 

Study and technical documents

1  Feasibility study:

  • Survey of the premises and preparation of existing-condition drawings
  • Consultation with the relevant district planning information service on specific conditions
Study and technical documents

2  Basic and detailed design project

  • Study of different layout options for the new dwelling
  • Site and location plan
  • General floor plans
  • Elevations and sections
  • Descriptive and technical report
  • General and project-specific specifications
  • Quantities and cost estimates
Administration

3  Planning authorisation

  • Management of the planning authorisation for the change of use: a licence or declaration of compliance, depending on the intervention, works and property conditions
  • Preparation and management of all official documents required by the council
Works

4  Architectural site supervision, where applicable

  • Direction and supervision of the work in accordance with the design and regulations
Works

5  Completion of works

  • Preparation of the final works certificate, endorsed by the Official Architects’ Association of Madrid
Study and technical documents

6  Change of use in the Cadastre

Study and technical documents

7  First occupation procedure

  • Management and processing of the appropriate first occupation procedure in accordance with the authorising instrument and works certificate

Change of use project costs and architect’s fees

This is the price of a commercial-to-residential conversion project. The fee depends on the floor area and scope of your property conversion. Construction supervision, completion documents and external charges are quoted separately.

* Minimum fee for a property of up to 75 m². Enter your floor area to see your price. VAT excluded.

Would you like to convert your commercial premises into a home? View our fees and commission your project.

Write to us and tell us about your premises

    I have read and accept the privacy policy and legal notice.